销售咨询热线
15953126901
18615254757
常见问题 question
企业案例 case

联系我们

  • 联系人:济南燕翔铁艺制品有限公司
  • 手机:15953126901
  • 电话:18615254757
  • 邮箱:785385551@qq.com
  • 地址:济南市天桥区历山北路黄台不锈钢市场3区317
当前位置: 首页 > 新闻资讯>常见问题铁艺护栏常规的安装方式分为什么?

铁艺护栏常规的安装方式分为什么?

来源:http://www.jnghbxg.com 日期:2023-05-25 发布人: 浏览次数:8
铁艺护栏在厂家制作完成后,还要经过装卸运输过程到工地,然后再进行安装。
After the iron guardrail is manufactured by the manufacturer, it needs to go through the process of loading, unloading, and transportation to the construction site before installation.
运输装卸:济南铁艺护栏出厂之前要做好包装,起码要把护栏的高点包装一下,如:护栏的立柱以及大的横管,中间的小管因为比大管矮,一般情况下磨不着,所以不用包装。
Transportation and loading and unloading: Firstly, before leaving the factory, Jinan Iron Art Guardrail should be well packaged. At least, the high points of the guardrail should be packaged, such as the columns of the guardrail and the large horizontal pipes. The small pipes in the middle cannot be ground because they are shorter than the large pipes, so packaging is not necessary.
如果一点都不包装的话,装卸过程以及运输过程很容易磨损,还要安装过程再磨损漆面的话,安装完之后漆面就非常难看了,工程的话很可能验收不过,切记包装很关键,俗话说货卖一张皮,就算不包装也没问题的话,包装一下也能提高产品的档次。
If there is no packaging at all, the loading and unloading process and transportation process are prone to wear and tear. If the paint surface needs to be worn during the installation process, it will be very unsightly after installation. If the project is not accepted, remember that packaging is crucial. As the saying goes, selling a piece of leather is not a problem, and packaging can also improve the quality of the product.
然后再就是安装,确定好安装方式,常规的安装方式分为:
Then there is the installation, determining the installation method. The conventional installation methods are divided into:
1:法兰盘固定也就是打膨胀螺栓固定,这种方式需要的工具有:冲击电锤、膨胀螺栓、铁锤、扳手、螺丝刀、卷尺等等,需要注意水泥地面平整度,紧膨胀螺栓的时候注意调整立柱的垂直度。
1: Fixing the flange plate is also known as fixing with expansion bolts. This method requires tools such as impact hammers, expansion bolts, hammers, wrenches, screwdrivers, tape measures, etc. It is necessary to pay attention to the flatness of the cement floor and adjust the verticality of the column when tightening the expansion bolts.
济南铁艺护栏
2:加长腿预埋也就是立柱挖坑浇筑,这种方式需要的工具有:水泥、沙子、石子等搅拌工具,小推车等运输工具。需要注意在浇筑混泥土时候好用石头或者砖块先把立柱固定住然后再浇灌混凝土,只用混凝土刚开始容易移动位置。
2: Long leg pre embedding, also known as column excavation and pouring, requires tools such as mixing tools such as cement, sand, and stones, as well as transportation tools such as small carts. It should be noted that when pouring concrete, it is better to use stones or bricks to fix the column first and then pour concrete, only using the position where the concrete is easy to move at the beginning.
3:下预埋铁焊接固定,这种方式需要提前下装预埋铁,安装的时候立柱或者横管直接焊接到预埋贴上,这样要要求预埋铁的尺寸和护栏的尺寸要高度一致,这种安装速度是快的,不过这种安装方式多少的会破坏漆面,需要把破坏的漆面打磨再上漆。
3: The lower embedded iron is welded and fixed. This method requires the installation of the embedded iron in advance. During installation, the column or horizontal pipe is directly welded to the embedded adhesive. This requires the size of the embedded iron and the size of the guardrail to be consistent in height. This installation speed is fast, but this installation method can damage the paint surface to some extent, and the damaged paint surface needs to be polished before painting.
这几种安装方式各有各的好处,根据实际情况来选择。注意调整好护栏的整体高度一致以及安装好的护栏在一条线上。更多相关内容就来我们网站http://www.jnghbxg.com咨询了解吧!
These installation methods each have their own advantages, and should be chosen according to the actual situation. Pay attention to adjusting the overall height of the guardrail to be consistent and the installed guardrail to be in line. For more related content, come to our website http://www.jnghbxg.com Consult and understand!